BarrierMesh

Your PSM is doing the work. Inspections, permits and controls across CMMS, PTW, Quality and EHS systems today. Drones, ground robots, AI agents and autonomous systems tomorrow. Hidden inside this evolution is leverage at your next engineering visit: RiskMark scores that move your base rate, Resilience Credit qualification, and claim investigations that compress from months of reconstruction to a verifiable record.

Evolve from claims to verifiable evidence

Right now, every inspection, finding, work order, and permit in your system is a claim you're making about what happened. BarrierMesh makes each one verifiable, cryptographically signed, spatially anchored, independently auditable without access to your systems.

What if your records were self-proving?
What if every workflow step produced its own proof?
Aerial Autonomous Inspection
Percepto AIM, Skydio, American Robotics
Ground Patrol Inspection
Boston Dynamics Spot, ANYbotics ANYmal, Ghost V60
Confined Space Inspection
Flyability Elios, Gecko Robotics
Mobile Field Devices
Tablet + fiducial, RealWear, smartphone
Risk Framework
BowTieXP, Enablon, RiskTec
EHS System of Record
Intelex, Enablon, Cority, ProcessMAP
Management of Change
Sphera MOC, Velocity EHS, internal tools
Training & Qualification
SAP SuccessFactors, Workday, Cornerstone
Work Order System (CMMS)
IBM Maximo, SAP PM, AVEVA AIM
Permit-to-Work System
eVision, ePermits, Cority PTW, paper
Identity & Access Control
Badging, biometric access, SCIM
Asset Information Management
AVEVA AIM, Smartplant, Bentley AssetWise

Six levers for your next renewal conversation.

Six evidence pillars for engineering based insurance policies (based on FM Global RiskMark).

P1
Equipment Integrity
The detection-to-closure chain proves every anomaly was resolved at the specific asset it was found on.
FM Global: Mechanical Integrity Quality → RiskMark → Base Rate
P2
Procedure Compliance
Spatial attestation proves each procedure was executed at the authorized location, by the confirmed crew, within the permit window.
FM Global: PSM Quality Score → RiskMark → Base Rate
P3
Zone Integrity
Physical isolation is confirmed at the equipment level — not just from aerial view, but at the barrier.
FM Global: PSM Quality Score + Emergency Response → RiskMark
P4
Observation & Near-Miss
Platform detections are chained to near-miss records and corrective action closures — spatially indexed, not self-reported.
FM Global: Near-Miss Program Quality → RiskMark → Base Rate
P5
Authorization Chain
Every high-consequence task carries a spatial PTW record — who authorized it, where the work happened, when it closed.
FM Global: Highest-weight PSM input → RiskMark → Base Rate
P6
Emergency Accountability
Muster records are spatially verified at the individual level — not radio-confirmed headcounts.
FM Global: Emergency Response Quality → RiskMark + Liability Exposure

Realistic addressable impact: 1–15% of total insurance premium over 1 - 2 renewal cycles. Opportunity range, not a commitment.

See what this looks like at your facility.

Find your biggest point of leverage for your next renewal in 2 minutes.

Run the Evidence Diagnostic
Run the evidence diagnostic